Barrett Group UK’s project for the JV between Buckingham Group and HOCHTIEF.
The contracted works consisted of constructing a railway bridge off line, (which required working to a very tight timescale to ensure the bridge was moved into position as per the original possession date) and a separate 60 meter long river bridge going over the River Calder. The Paraslim were attached to the bridge beams at ground level along with the EMJ soffit and lifted into position as part of the super lift.